Supplier Terms and Conditions


General. As a supplier to Electro Erosion Specialties, Inc. (EESI) you become a key contributor to the products and services that we deliver to our customers. We value the conformance of your products and services to our specifications and requirements, your contribution to our product’s safety, and your ethical business practices. If you are bidding on one of our RFQs, it is understood that your organization agrees to meet the following AS9100 requirements whenever an EESI purchase order specifies that the order is for an aircraft product subject to AS9100 requirements, hereafter called an “aircraft product” order.

 

Scope. These terms and conditions apply to all external suppliers and sub-tier suppliers which furnish products, processes, or services to be incorporated into EESI contractually identified products or services delivered.

 

1.     All special process must be performed by qualified and competent persons.

2.     EESI performs inspection activities to ensure that purchased product meets requirements, including:

A. Receiving inspections (of supplier products / services / documents) performed by a designated employee. EESI verifies the authenticity of the appropriate certificate of conformity, material certificates, etc. and other accompanying documentation by review and comparison (as is appropriate) to the drawing and/or industry specifications, or by other means. When necessary, EESI may inspect or perform an audit at the supplier’s facility.

B. Product inspections to ensure they meet requirements, dimensions, etc. Special processes (anodizing, heat treat, welding, etc.) where compliance cannot be verified by inspection will require a Certificate of Conformity.

C. At a minimum, Product/service conformity and on-time delivery will be monitored by EESI Key suppliers will be evaluated on a periodic basis.

3.     EESI may request on-site product verification and inspection, at supplier’s premises when source inspection is required or when other methods of testing, inspection and verification are not adequate. When EESI or its customer intends to perform verification at the supplier’s premises, EESI will first state the intended verification arrangements and the method of product release. This information will be communicated on the EESI RFQ, purchase order, or via another acceptable purchasing arrangement.

4.     Supplier may be asked to provide test specimens for design approval, inspection, verification, investigation or auditing.

5.     EESI normally has no specific design or development control requirements. Any special requirements, critical items or key characteristics on a “build to print” item or an item to be manufactured to a Buyer supplied drawing, will be listed on our PO

6.     EESI reserves the right to designate requirements for first article reports or tests, specimens, design approval, inspection/verification sampling, statistical techniques, and/or key characteristics.  Additional requirements above and beyond the normal deliverable items will be specified on the Purchase Order.

7.     Supplier is required to maintain compliance to a Quality Management System standard and notify Buyer of changes to certification status.

8.     EESI will require our external providers to apply the appropriate controls to their direct and sub-tier external providers to ensure that product requirements are met. The appropriate controls may include customer/regulatory/AS9100 specific requirements and will be indicated on the EESI purchase order. This may also include using EESI customer-designated or approved external providers, including process sources.

9.     Suppliers must use EESI customer-approved special process sources (anodize, heat treat, welding, etc.) when indicated on a EESI purchase order.

10. The supplier shall notify EESI of any changes to a product and/or processes, including changes of external providers or location of manufacture, that may affect conformance to specifications or requirements, and to obtain approval from an authorized EESI manager or designee prior to production. If a First Article of Inspection (FAI) was required by the contract for the first product, a new FAI shall be required from the supplier.

11. EESI requires that the Supplier have policies and procedures to identify potential Counterfeit Parts from suppliers. Seller shall immediately notify EESI with the pertinent facts if Supplier becomes aware of or suspects that Counterfeit Parts may have been used in a product delivered to EESI If products delivered under this order constitutes or includes Counterfeit Parts, Supplier shall, at its expense, promptly replace such Counterfeit Parts with genuine parts conforming to the requirements of this order. Notwithstanding any other provision in this order, Seller shall be liable for all costs relating to the removal and replacement of counterfeit parts.

12. The supplier must contact EESI in the event of nonconforming product/material. Arrangements for the approval of supplier nonconforming product/material must be as directed by a EESI authorized manager or designee.

13. EESI our customers, and regulatory authorities retain the right of access to supplier:

A. Facilities involved in the aircraft product order.

B. Records applicable to product conformance to specifications, which shall be retained for 7 years from date of purchase order and archived beyond that time.

14. Supplier and those performing work are expected to act ethically, honestly, and with the highest standard of personal integrity at all times in the performance of work, product / service conformity and product safety.

15. To ensure product identification and traceability, EESI will institute controls that include the requirement of Material Certificates, Certificates of Conformity, and/or other supporting documentation from its suppliers as is appropriate. These requirements may be specified on EESI RFQ, purchase order, or may otherwise be communicated to the supplier.

16. EESI will not approve vendors that are debarred from doing business with the US Government or are listed on the US Department of State list of debarred persons / entities.

17. EESI may also require specific actions where timely and/or effective corrective actions to a supplier issue are not achieved. These actions may include but are not limited to any or all of the following: withholding payment until the issue is resolved, removal of the supplier from EESI Approved Supplier List, and legal action.

18. Most interactions between EESI and Supplier will be over electronic mail or telephone. Buyer does on occasion use online sourcing portals to inquire and receive initial quotations.

19. Supplier must maintain the proper identification and revision status of specifications, drawings, process, requirements, inspection/verification instructions, and other relevant technical data. The latest revision of the specification or drawing to be used in manufacture and inspection, unless specific written instruction requesting a previous revision is specified.